Rapid progress from new Southern California chassis model

Rapid progress from new Southern California chassis model

Earlier this year before the three major equipment-leasing companies formed a gray chassis pool in Los Angeles-Long Beach, Direct ChassisLink Inc. was positioning 300 chassis into a marine terminal in Long Beach while Flexi-Van Leasing was pulling 280 of them out of the same facility. Thanks to the gray, or neutral chassis pool that went into operation on Mach 1, that type of inefficiency has very quickly become a thing of the past.

You are only viewing part of this page, please log in below to view. If you do not have an account, please register for limited access or subscribe for unlimited access to JOC.com.